Vestfyen Brewery in Denmark is a high-energy consumer and therefore it has been decided to replace its existing oil-fired heating system with a wood-chip heating one. Its production’s energy use will hence be able to be termed as CO2 neutral.
To this end, Linatech, together with Focus BioEnergy, has been responsible for the entire delivery system and its screw conveyors as well as the manufacture of the combustion grate.
Linatech has additionally taken on the installation of the entire boiler plant that had arrived in two sections and then welded together on site.
Finally, Linatech performed a pressure test at 135 bar on the completed installation.